Labor & AttendanceIncluded

Project Labor

Review labor recorded against projects, approve eligible work, and understand what counts toward actual labor cost.

Where project labor comes from

  • Attendance submitted through Prospeno Field
  • Kiosk or web attendance
  • Manual individual labor entered by an authorized user
  • Batch labor used when a crew cost must be recorded without individual attendance

Record and review labor

  1. 1

    Choose the correct labor type

    Use an individual entry for a known employee. Use batch labor only when the crew is being recorded as a group rather than as individual attendance.

  2. 2

    Check the work details

    Review the employee or crew, project, work date, hours, calculated cost, and any required evidence.

  3. 3

    Review the approval status

    Pending records still need review. Approved eligible labor can count toward project cost. Rejected labor does not.

  4. 4

    Resolve incomplete entries

    Open entries or missing evidence should be reviewed before relying on the final project labor total.

Individual labor statuses

StatusMeaningProject cost
PendingWaiting for review.Not yet included as approved labor cost.
ApprovedReviewed and accepted.Eligible completed labor contributes to actual project labor cost.
RejectedNot accepted.Excluded from approved project cost.

Missing Selfie or similar evidence indicators are attention states rather than a replacement for the approval status.

Batch labor

Use batch labor when a crew cost needs to be estimated without creating individual employee records.

Calculate from rate

  • Enter crew size, hours, and the applicable rate.
  • Prospeno calculates the estimated crew cost.

Enter total cost

  • Use the known total crew cost directly.
  • No individual employee attendance is created.

Project Labor, Timesheet, and Payroll are different

Project Labor

  • Tracks labor cost connected to projects.
  • Use it to review the records that affect project labor cost.

Timesheet / Payroll

  • Timesheet summarizes employee work records.
  • Payroll calculates and reviews employee compensation in its own workflow.

How labor affects project profit

Approved eligible project labor increases actual project cost. If actual labor exceeds the budgeted labor baseline, projected profit and margin can decrease.

  • General Work has no project reference, so it does not affect the profit of an individual project.
  • Pending, rejected, incomplete, or open labor can make the displayed labor total provisional.

Important notes

  • Approval permissions depend on role and route.
  • Labor cost visibility may be restricted for Supervisors and Employees.
  • Project assignment gives access to the project; it does not create a labor record automatically.
Project Labor | Prospeno Help